Project scheduling problem with stochastic activity duration times

Project scheduling problem with stochastic activity duration times

0.00 Avg rating0 Votes
Article ID: iaor2007648
Country: Netherlands
Volume: 168
Issue: 1
Start Page Number: 342
End Page Number: 353
Publication Date: Sep 2005
Journal: Applied Mathematics and Computation
Authors: ,
Keywords: heuristics: genetic algorithms, programming: probabilistic
Abstract:

Project scheduling problem is to determine the schedule of allocating resources so as to balance the total cost and the completion time. This paper considers project scheduling problem with stochastic activity duration times, which has the objective of minimizing the total cost under some completion time limits. Three types of stochastic models will be built to solve the problem according to different management requirements. Moreover, stochastic simulation and genetic algorithm will be integrated to design a hybrid intelligent algorithm to solve the above models. Finally, some numerical examples are illustrated to show the effectiveness of the algorithm.

Reviews

Required fields are marked *. Your email address will not be published.