A scatter search algorithm for project scheduling under partially renewable resources

A scatter search algorithm for project scheduling under partially renewable resources

0.00 Avg rating0 Votes
Article ID: iaor20062039
Country: Netherlands
Volume: 12
Issue: 1/2
Start Page Number: 95
End Page Number: 113
Publication Date: Jan 2006
Journal: Journal of Heuristics
Authors: , , ,
Keywords: heuristics, scheduling
Abstract:

In this paper we develop a heuristic algorithm, based on Scatter Search, for project scheduling problems under partially renewable resources. This new type of resource can be viewed as a generalization of renewable and non-renewable resources, and is very helpful in modelling conditions that do not fit into classical models, but which appear in real timetabling and labor scheduling problems. The Scatter Search algorithm is tested on existing test instances and obtains the best results known so far.

Reviews

Required fields are marked *. Your email address will not be published.