Article ID: | iaor20062039 |
Country: | Netherlands |
Volume: | 12 |
Issue: | 1/2 |
Start Page Number: | 95 |
End Page Number: | 113 |
Publication Date: | Jan 2006 |
Journal: | Journal of Heuristics |
Authors: | Alvarez-Valdes R., Tamarit J.M., Crespo E., Villa F. |
Keywords: | heuristics, scheduling |
In this paper we develop a heuristic algorithm, based on Scatter Search, for project scheduling problems under partially renewable resources. This new type of resource can be viewed as a generalization of renewable and non-renewable resources, and is very helpful in modelling conditions that do not fit into classical models, but which appear in real timetabling and labor scheduling problems. The Scatter Search algorithm is tested on existing test instances and obtains the best results known so far.