On the optimal allocation of two active redundancies in a two-component series system

On the optimal allocation of two active redundancies in a two-component series system

0.00 Avg rating0 Votes
Article ID: iaor20061544
Country: Netherlands
Volume: 34
Issue: 1
Start Page Number: 49
End Page Number: 52
Publication Date: Jan 2006
Journal: Operations Research Letters
Authors: ,
Abstract:

Components C1 and C2 form a series system. Suppose we can allocate the spare R1 in parallel with C1 and the spare R2 in parallel with C2, or otherwise, allocate R1 with C2 and R2 with C1. In this paper, we compare these two options using hazard rate ordering.

Reviews

Required fields are marked *. Your email address will not be published.