On minimizing completion time variance on a single machine subject to stochastic breakdowns

On minimizing completion time variance on a single machine subject to stochastic breakdowns

0.00 Avg rating0 Votes
Article ID: iaor2006469
Country: China
Volume: 8
Issue: 2
Start Page Number: 1
End Page Number: 8
Publication Date: May 2004
Journal: OR Transactions
Authors:
Abstract:

This paper addresses a stochastic scheduling problem in which n jobs are to be processed on a single machine. The machine is subject to stochastic breakdowns, characterized by a generalized Poisson process. The objective is to find the schedule to minimize the expected variance of completion times. The deterministic equivalent of the stochastic scheduling problem is developed. Optimal sequences are derived for the special case with identical processing times.

Reviews

Required fields are marked *. Your email address will not be published.