Disaggregating aggregate production plans to smooth workload variation

Disaggregating aggregate production plans to smooth workload variation

0.00 Avg rating0 Votes
Article ID: iaor19911245
Country: Netherlands
Volume: 19
Issue: 1/3
Start Page Number: 189
End Page Number: 195
Publication Date: May 1990
Journal: Engineering Costs and Production Economics
Authors: ,
Abstract:

This paper proposes a heuristic approach for disaggregating aggregate production plans and smoothing workload variation. The result is a detailed schedule for each product which states the quantity to be made in each period. The batch size is made consistent with technical and economic constraints. A priority rule based on inventory levels and workload smoothing is derived. Adaptable factors to widen the range of application are incorporated. The approach is examined by means of simulation and the overall results indicate that the approach could provide substantial benefits.

Reviews

Required fields are marked *. Your email address will not be published.