Article ID: | iaor1988482 |
Country: | Switzerland |
Volume: | 15 |
Start Page Number: | 269 |
End Page Number: | 287 |
Publication Date: | Dec 1988 |
Journal: | Annals of Operations Research |
Authors: | Ahmadi Javad H., Ali Agha Iqbal |
Keywords: | scheduling, simulation |
This study reports the development of a production scheduling system for the integrated management of production in large-scale, high-volume electronic assembly lines. The development of the system incorporates control and planning considerations by addressing the interaction of various subsystems. Stochastic and deterministic aspects of the problem environment are appropriately handled via relevant simulation and analytic models. By effecting a hierarchical breakdown of the problem environment, the system produces information used in practical decision making for production planning and scheduling. Procedures used encompass and address considerations for management of work-in-process, optimization of the various subsystems’ performance, minimization of setup time effect, and inventory carrying costs.