Heuristic methods for gang-rip saw arbor design

Heuristic methods for gang-rip saw arbor design

0.00 Avg rating0 Votes
Article ID: iaor20051829
Country: Netherlands
Volume: 154
Issue: 3
Start Page Number: 626
End Page Number: 640
Publication Date: May 2004
Journal: European Journal of Operational Research
Authors: ,
Keywords: heuristics
Abstract:

We consider the problem of design and scheduling of arbors for a computer assisted gang-rip saw system. Such systems are typically used within the furniture manufacturing industry for processing lumber. We discuss the computational complexity of the problem, and develop several heuristic procedures for solving it. These procedures are based on the principles of local improvement, simulated annealing and genetic algorithms. The results of a computational experiment are also presented.

Reviews

Required fields are marked *. Your email address will not be published.