Article ID: | iaor2005909 |
Country: | Netherlands |
Volume: | 38 |
Issue: | 2 |
Start Page Number: | 171 |
End Page Number: | 182 |
Publication Date: | Nov 2004 |
Journal: | Decision Support Systems |
Authors: | Jzefczyk Jerzy |
Keywords: | decision: studies, production: FMS |
A two-level manufacturing operation system composed of two interconnected subproblems, i.e. scheduling of independent, non-preemptive tasks on unrelated moving executors as well as motion control of a group of moving executors performing the tasks is investigated. As the performance index of the two-level system, the makespan is assumed. Three heuristic solution algorithms for the two-level system are presented. The first algorithm ensures the current modification of solutions for the scheduling subproblem during the decision procedure of the two-level system. In the second one, an iterative approach is applied, which consists in successive implementation of the solution algorithms for both subproblems. The third algorithm uses on-line procedure, which enables determination of the best solution in the current step of the decision procedure. Comparisons of the algorithms as well as a numerical example are also presented.