The MPS parameterization under lead time uncertainty

The MPS parameterization under lead time uncertainty

0.00 Avg rating0 Votes
Article ID: iaor2005114
Country: Netherlands
Volume: 90
Issue: 3
Start Page Number: 369
End Page Number: 376
Publication Date: Jan 2004
Journal: International Journal of Production Economics
Authors: ,
Keywords: newsboy problem
Abstract:

The supply planning of assembly systems under lead times uncertainty is studied. The used criterion is the sum of the average holding cost for the components, the averaging backlogging cost for the finished product, and the setup cost. The decision variables are the planned lead times of components and the periodic ordering quantity. A new generalized Newsboy model gives the optimal solution under the assumption that the lead times of the different types of components follow the same distribution probability, and that the holding costs per period of the ordered quantities are the same.

Reviews

Required fields are marked *. Your email address will not be published.