An optimal timing model of water reallocation and reservoir construction

An optimal timing model of water reallocation and reservoir construction

0.00 Avg rating0 Votes
Article ID: iaor20042747
Country: Netherlands
Volume: 145
Issue: 1
Start Page Number: 165
End Page Number: 174
Publication Date: Feb 2003
Journal: European Journal of Operational Research
Authors: ,
Keywords: location, optimization
Abstract:

Growth of the users base often reduces the efficiency of existing water allocation policies and causes new water supplies to cost more than the value of water in existing use. Historically, water management authorities have shown a bias toward undertaking of new supply projects and delay of necessary reallocations. This study provides an analysis of the timing and adjustments associated with construction of new reservoirs and reallocation of existing supplies. A dynamic model yields simultaneously the optimal construction timing of new projects and guidelines for reallocation of existing supplies. A number of sensitivity results provide additional insights

Reviews

Required fields are marked *. Your email address will not be published.