| Article ID: | iaor20042606 |
| Country: | Netherlands |
| Volume: | 147 |
| Issue: | 2 |
| Start Page Number: | 373 |
| End Page Number: | 396 |
| Publication Date: | Jun 2003 |
| Journal: | European Journal of Operational Research |
| Authors: | Allahverdi Ali |
| Keywords: | heuristics |
This paper considers the flowshop scheduling problem with the objective of minimizing the weighted sum of makespan and mean flowtime. Even though the two-machine problem has been addressed and several heuristics have been established in the literature, these heuristics have not been compared. In this paper, a comparison of these available heuristics in the literature is conducted. Moreover, three new heuristic algorithms are proposed, which can be utilized for both the two-machine and