Article ID: | iaor20042606 |
Country: | Netherlands |
Volume: | 147 |
Issue: | 2 |
Start Page Number: | 373 |
End Page Number: | 396 |
Publication Date: | Jun 2003 |
Journal: | European Journal of Operational Research |
Authors: | Allahverdi Ali |
Keywords: | heuristics |
This paper considers the flowshop scheduling problem with the objective of minimizing the weighted sum of makespan and mean flowtime. Even though the two-machine problem has been addressed and several heuristics have been established in the literature, these heuristics have not been compared. In this paper, a comparison of these available heuristics in the literature is conducted. Moreover, three new heuristic algorithms are proposed, which can be utilized for both the two-machine and