Fuzzy temporal characteristics of operations for project management on the network models basis

Fuzzy temporal characteristics of operations for project management on the network models basis

0.00 Avg rating0 Votes
Article ID: iaor20042576
Country: Netherlands
Volume: 147
Issue: 2
Start Page Number: 253
End Page Number: 265
Publication Date: Jun 2003
Journal: European Journal of Operational Research
Authors: ,
Keywords: fuzzy sets, graphs
Abstract:

The temporal aspects of operations management under fuzzy durations are investigated. It is proposed the models of fuzzy temporal characteristics of operations on the basis of direct application of the extension principle of Zadeh to the critical path method. Method of computing of the fuzzy time windows for floats and the latest start and completion of operations on the basis of graph decomposition is represented. The method is demonstrated by an example problem.

Reviews

Required fields are marked *. Your email address will not be published.