Article ID: | iaor20041592 |
Country: | China |
Volume: | 24 |
Issue: | 6 |
Start Page Number: | 5 |
End Page Number: | 7 |
Publication Date: | Jun 2002 |
Journal: | Chinese Journal of Systems Engineering and Electronics |
Authors: | Geng Zhaoqiang, Zou Yiren |
Keywords: | fuzzy sets |
This paper studies fuzzy flow-shop scheduling problems which involve both fuzzy processing time and fuzzy due date. Fuzzy processing time is denoted by a triangular fuzzy number and fuzzy due date is denoted by a trapezoid one. A genetic algorithm is adopted to find the optimal sequencing. When dealing with the fitness function, we introduce some fuzzy number processing methods and use the maximum average agreement index as objective. Finally, the simulation results and conclusion are given.