Article ID: | iaor2004981 |
Country: | Germany |
Volume: | 25 |
Issue: | 1 |
Start Page Number: | 85 |
End Page Number: | 96 |
Publication Date: | Jan 2003 |
Journal: | OR Spektrum |
Authors: | Flapper S.D.P., Teunter R.H. |
Keywords: | lot sizing |
We consider a single-stage single-product production system. Produced units may be non-defective, reworkable defective, or non-reworkable defective. The system switches between production and rework. After producing a fixed number (