Article ID: | iaor2004643 |
Country: | South Korea |
Volume: | 19 |
Issue: | 2 |
Start Page Number: | 139 |
End Page Number: | 153 |
Publication Date: | Nov 2002 |
Journal: | Korean Management Science Review |
Authors: | Cho Keun-Tae |
Keywords: | analytic hierarchy process |
The Analytic Hierarchy Process (AHP) is known as a very useful decision-making model developed for obtaining the relative weights of alternative through pairwise comparison in the context of hierarchical structure. In this paper, we propose a method to reflect the reliability of evaluators in the process of pairwise comparison. This method is applied to the evaluation of aerospace technology alternatives. We have conducted a questionnaire survey for S company that is one of the representative aerospace companies in Korea. A questionnaire was designed for obtaining both the priority with considering the reliability of evaluators' importance weights (the modified AHP priority) and the priority with assuming equally reliable evaluators' importance weights (the AHP priority) in order to compare the priority derived by each of two methods. The result shows that there exists the difference hard to neglect between the final priorities gained by two methods.