Multiobjective flow-shop scheduling

Multiobjective flow-shop scheduling

0.00 Avg rating0 Votes
Article ID: iaor1991536
Country: United States
Volume: 37
Issue: 6
Start Page Number: 981
End Page Number: 995
Publication Date: Dec 1990
Journal: Naval Research Logistics
Authors: ,
Keywords: programming: multiple criteria
Abstract:

Previous research on the scheduling of multimachine systems has generally focused on the optimization of individual performance measures. This article considers the sequencing of jobs through a multimachine flow shop, where the quality of the resulting schedule is evaluated according to the associated levels of two scheduling criteria, schedule makespan (Cmax) and maximum job tardiness (Tmax). The authors present constructive procedures that quantify the trade-off between Cmax and Tmax. The significance of this trade-off is that the optimal solution for any preference function involving only Cmax and Tmax must be contained among the set of effi

Reviews

Required fields are marked *. Your email address will not be published.