| Article ID: | iaor1991534 |
| Country: | United States |
| Volume: | 37 |
| Issue: | 5 |
| Start Page Number: | 789 |
| End Page Number: | 805 |
| Publication Date: | Oct 1990 |
| Journal: | Naval Research Logistics |
| Authors: | Iskander Wafik H., Chou Jar |
This article presents a mathematical model for manpower scheduling for unbalanced production lines in order to minimize in-process inventory cost. The model extends prior work by adding workers’ skill limitations to the system. The model is formulated for a one-period schedule and then extended for multiperiod schedules. An example problem is solved for both single and multiperiods. A heuristic algorithm is also presented for multiperiod and large-scale problems, and computational experiences are reported.