| Article ID: | iaor20033170 |
| Country: | Netherlands |
| Volume: | 102 |
| Issue: | 1 |
| Start Page Number: | 45 |
| End Page Number: | 57 |
| Publication Date: | Apr 2003 |
| Journal: | Annals of Operations Research |
| Authors: | Vitoriano B., Centeno E., Campos A., Muoz A., Villar J., Snchez-beda E.F. |
| Keywords: | programming: goal, scheduling, programming: integer |
In deregulated electrical systems, production schedule for power plants is the result of an auction process. In the Spanish case, this schedule includes two main concepts: energy production (to be actually produced) and secondary reserve (to maintain available). The generation company faces the problem of converting energy schedule into a power schedule, respecting the reserve schedule as well as technical constraints, and trying to accomplish different goals: to minimise the production costs, to obtain smooth shapes for the power schedules and to optimise eventual compensation in schedules. A weighted goal mixed integer programming model with a real-size application to deal with this problem is presented.