Abstract:

In deregulated electrical systems, production schedule for power plants is the result of an auction process. In the Spanish case, this schedule includes two main concepts: energy production (to be actually produced) and secondary reserve (to maintain available). The generation company faces the problem of converting energy schedule into a power schedule, respecting the reserve schedule as well as technical constraints, and trying to accomplish different goals: to minimise the production costs, to obtain smooth shapes for the power schedules and to optimise eventual compensation in schedules. A weighted goal mixed integer programming model with a real-size application to deal with this problem is presented.

Reviews

Required fields are marked *. Your email address will not be published.