| Article ID: | iaor20031131 |
| Country: | Netherlands |
| Volume: | 63 |
| Issue: | 11 |
| Start Page Number: | 1846 |
| End Page Number: | 1849 |
| Publication Date: | Nov 2002 |
| Journal: | Automation and Remote Control |
| Authors: | Furugyan M.G. |
| Keywords: | allocation: resources |
The problem of allocating the amended resources in a real-time automated control system under a constrained time of executing the given assembly of uninterrupted jobs was considered. At some indefinite time instants, the resources available can be given to higher-priority jobs. As the result, execution of the initial job assembly is suspended, thus violating the initial schedule. A strategy of constructing admissible schedules with the minimum probability of their violation was developed.