Scheduling railway traffic at a construction site

Scheduling railway traffic at a construction site

0.00 Avg rating0 Votes
Article ID: iaor2003573
Country: Germany
Volume: 24
Issue: 1
Start Page Number: 19
End Page Number: 30
Publication Date: Jan 2002
Journal: OR Spektrum
Authors: , ,
Keywords: engineering, vehicle routing & scheduling
Abstract:

We consider the problem of rescheduling trains in the case where one track of a railway section consisting of two tracks in opposing directions is closed due to construction activities. After presenting an appropriate model for this situation we derive a polynomial algorithm for the subproblem of finding an optimal schedule with minimal lateness if the subsequences of trains for both directions outside the construction site are fixed. Based on this algorithm we propose a local search procedure for the general problem of finding good schedules and report test results for some real world instances.

Reviews

Required fields are marked *. Your email address will not be published.