Article ID: | iaor2003501 |
Country: | Germany |
Volume: | 23 |
Issue: | 3 |
Start Page Number: | 383 |
End Page Number: | 394 |
Publication Date: | Jan 2001 |
Journal: | OR Spektrum |
Authors: | Trautmann N., Mellentien C. |
Keywords: | allocation: resources |
We present results of a benchmark test evaluating the resource allocation capabilities of the project management software packages Acos Plus.1 8.2, CA SuperProject 5.0a, CS Project Professional 3.0, MS Project 2000, and Scitor Project Scheduler 8.0.1. The tests are based on 1560 instances of precedence- and resource-constrained project scheduling problems. For different complexity scenarios, we analyze the deviation of the makespan obtained by the software packages from the best feasible make-span known. Among the tested software packages, Acos Plus.1 and Project Scheduler show the best resource allocation performance. Moreover, our numerical analysis reveals a considerable performance gap between the implemented methods and state-of-the-art project scheduling algorithms, especially for large-sized problems. Thus, there is still a significant potential for improving solutions to resource allocation problems in practice.