Study of time parameters and the critical path in engineering building project network planning

Study of time parameters and the critical path in engineering building project network planning

0.00 Avg rating0 Votes
Article ID: iaor20023189
Country: China
Volume: 26
Issue: 2
Start Page Number: 95
End Page Number: 97
Publication Date: Jun 2001
Journal: Journal of Guangxi University
Authors: ,
Keywords: engineering
Abstract:

In this paper we studied the computing problem of finding the critical path in the project management using planning technology in the management of engineering building. It provided a suitable way of resolving the material needs for the building and engineering plan.

Reviews

Required fields are marked *. Your email address will not be published.