Article ID: | iaor20023113 |
Country: | China |
Volume: | 24 |
Issue: | 2 |
Start Page Number: | 237 |
End Page Number: | 244 |
Publication Date: | Mar 2001 |
Journal: | Journal of the Chinese Institute of Engineers |
Authors: | Chern Maw-Sheng, Teng Jinn-Tsair, Yang Hui-Ling |
In this paper, we first establish the necessary and sufficient conditions to solve the problem in determining the timing and number of replenishments for the Bass model. We then develop several fundamental theoretical results. Furthermore, a one-dimensional iterative method is proposed to find the optimal replenishment schedule. Finally, we provide an intuitively accurate estimate for the optimal number of replenishments, which significantly reduces computational complexity in finding the optimal replenishment number.