Bi-level decision method for multi-resource constrained multi-project scheduling

Bi-level decision method for multi-resource constrained multi-project scheduling

0.00 Avg rating0 Votes
Article ID: iaor20022813
Country: China
Volume: 21
Issue: 2
Start Page Number: 1
End Page Number: 5
Publication Date: Feb 2001
Journal: Systems Engineering Theory & Practice
Authors: , ,
Abstract:

In this paper, the characteristics of multi-resource constrained multi-project scheduling problem is analyzed. A bilevel decision method is used to construct the mathematical model of this problem. A stochastic global optimization method based on direct search is introduced to solve the global optimal solution of the problem, and the process is also discussed in detail. The results of mathematical examples indicate that the mathematical model and the optimization method proposed in this paper can solve the multi-resource constrained multi-project scheduling problem effectively.

Reviews

Required fields are marked *. Your email address will not be published.