An optimization algorithm for solving a multi-mode resource-constrained project scheduling problem

An optimization algorithm for solving a multi-mode resource-constrained project scheduling problem

0.00 Avg rating0 Votes
Article ID: iaor20022810
Country: China
Volume: 16
Issue: 1
Start Page Number: 55
End Page Number: 60
Publication Date: Feb 2001
Journal: Journal of Systems Engineering and Electronics
Authors: , ,
Keywords: optimization: simulated annealing, project management
Abstract:

In this paper, we design a Simulated Annealing with Genetic Algorithm hybrid for a solving multi-model resource-constrained project scheduling problem. Through computational study for a standard set of project instances which has been widely used, we obtained some satisfactory results.

Reviews

Required fields are marked *. Your email address will not be published.