Article ID: | iaor20022738 |
Country: | China |
Volume: | 16 |
Issue: | 1 |
Start Page Number: | 24 |
End Page Number: | 29 |
Publication Date: | Feb 2001 |
Journal: | Journal of Systems Engineering and Electronics |
Authors: | Zhang Xiaodong, Yan Hongsen, Dong Hao |
Keywords: | programming: linear |
The paper explores the problem of optimal production planning in flexible automated workshops (FAWs) under the condition of demand being just satisfied. A nonlinear programming model of production planning with demand constraints is built up and then transformed into a linear programming model by adding constraints. Because the scale of the model for a general workshop is too large to be solved by the simplex method on a microcomputer within acceptable time, Karmarkar's algorithm and an interaction/prediction algorithm are used to solve the model, on the basis of which the programs described herein have been written. Through production planning examples, The Karmarkar's algorithm, interaction/prediction algorithm and linear programming method in Matlab are compared, thus showing that the proposed approaches are very suitable for decomposing optimally medium-term plans (assigned to an FAW by ERP/MRP II) into short-term plans (to be executed by FMSs in the FAW).