Machine layout problem in a production line

Machine layout problem in a production line

0.00 Avg rating0 Votes
Article ID: iaor1991136
Country: South Korea
Volume: 15
Issue: 1
Start Page Number: 31
End Page Number: 39
Publication Date: Jun 1989
Journal: Journal of the Korean Institute of Industrial Engineers
Authors:
Abstract:

The throughput of a production line can be improved by a proper layout of machines and also by meterial flow control between machines. This paper presents a heuristic method of determining machine layout in one-dimensional space to reduce travel distance of material transporters. The heuristic method is compared to an optimum solution method to measure its performance. [In Korean.]

Reviews

Required fields are marked *. Your email address will not be published.