Article ID: | iaor1990996 |
Country: | United States |
Volume: | 23 |
Issue: | 2/3 |
Start Page Number: | 217 |
End Page Number: | 219 |
Publication Date: | Sep 1989 |
Journal: | Journal of Advanced Transportation |
Authors: | Gomes Luiz F.A.M. |
Keywords: | decision |
This note shows a numerical comparison of TODIM and ELECTRE II, two alternative methods for multicriteria ranking of projects. Ranks obtained from both methods are compared at a level of significance of 0.01. The results suggest a practical advantage of TODIM over ELECTRE II.