| Article ID: | iaor2002604 |
| Country: | United States |
| Volume: | 32 |
| Issue: | 5 |
| Start Page Number: | 409 |
| End Page Number: | 419 |
| Publication Date: | May 2000 |
| Journal: | IIE Transactions |
| Authors: | He Q.M., Jewkes E.M. |
| Keywords: | production, inventory, markov processes |
This paper develops two algorithms for computing the average total cost per product and other performance measures for a make-to-order inventory–production system. The two algorithms are developed by using matrix analytic methods. The first algorithm is based on the matrix-geometric solution of the Quasi-Birth-and-Death (QBD) Markov process. The second algorithm is based on the fundamental period of the QBD Markov process. The advantages and disadvantages of the two algorithms are discussed.