Optimal production and setup scheduling: A one-machine, two-product system

Optimal production and setup scheduling: A one-machine, two-product system

0.00 Avg rating0 Votes
Article ID: iaor2002200
Country: Netherlands
Volume: 98
Issue: 1
Start Page Number: 291
End Page Number: 311
Publication Date: Dec 2000
Journal: Annals of Operations Research
Authors: , ,
Abstract:

This paper studies the scheduling problem for two products on a single production facility. The objective is to specify a production and setup policy that minimizes the average inventory, backlog, and setup costs. Assuming that the production rate can be adjusted during the production runs, we provide a close form for an optimal production and setup schedule. Dynamic programming and Hamilton–Jacobi–Bellman equation is used to verify the optimality of the obtained policy.

Reviews

Required fields are marked *. Your email address will not be published.