A note on the paper ‘Resource-constrained project scheduling: Notation, classification, models and methods’ by Brucker et al

A note on the paper ‘Resource-constrained project scheduling: Notation, classification, models and methods’ by Brucker et al

0.00 Avg rating0 Votes
Article ID: iaor20013856
Country: Netherlands
Volume: 128
Issue: 3
Start Page Number: 679
End Page Number: 688
Publication Date: Feb 2001
Journal: European Journal of Operational Research
Authors: , ,
Keywords: scheduling
Abstract:

The great variety of project scheduling problems studied in the ever growing literature motivated the recent development of classification schemes. In a recent paper, Brucker et al. make the claim that, so far, no classification scheme exists which is compatible with what is commonly accepted in machine scheduling and introduce a new classification. In this note, we critically review major shortcomings of the suggested scheme which place heavy limitations on its potential use.

Reviews

Required fields are marked *. Your email address will not be published.