Article ID: | iaor20013343 |
Country: | Germany |
Volume: | 52 |
Issue: | 3 |
Start Page Number: | 489 |
End Page Number: | 499 |
Publication Date: | Jan 2000 |
Journal: | Mathematical Methods of Operations Research (Heidelberg) |
Authors: | Wglarz Jan, Jzefowska J., Mika M., Rycki R., Waligra G. |
Keywords: | optimization: simulated annealing |
In this paper a discrete-continuous project scheduling problem is considered. In this problem activities simultaneously require discrete and continuous resources. The processing rate of each activity depends on the amount of the continuous resource allotted to this activity at a time. All the resources are renewable ones. The activities are nonpreemptable and the objective is to minimize the makespan. Discretization of this problem leading to a classical (i.e. discrete) project scheduling problem in the multi-mode version is presented. A simulated annealing (SA) approach to solving this problem is described and tested computationally in two versions: with and without finding an optimal continuous resource allocation for the final schedule. In the former case a nonlinear solver is used for solving a corresponding convex programming problem. The results are compared with the results obtained using SA for the discrete-continuous project scheduling problem where the nonlinear solver is used for exact solving the continuous part in each iteration. The results of a computational experiment are analyzed and some conclusions are included.