Article ID: | iaor20013250 |
Country: | Germany |
Volume: | 21 |
Issue: | 3 |
Start Page Number: | 361 |
End Page Number: | 379 |
Publication Date: | Jan 1999 |
Journal: | OR Spektrum |
Authors: | Salewski F. |
Keywords: | heuristics, scheduling |
Approaches to manpower scheduling are dealt with in different problem areas where similarities between the approaches have been neglected. To overcome this deficit a general model to manpower scheduling has been formulated which is based on new modeling concepts extending the Multi-Mode Resource-Constrained Project Scheduling Problem. Into this model problems from different areas are embeddable with suitable parameter instantiations. For this new model a priority rule-based heuristic specifically tailored to the problem structure is described. Its suitability is demonstrated by an extensive computational experiment.