Article ID: | iaor20011907 |
Country: | Netherlands |
Volume: | 93 |
Issue: | 1 |
Start Page Number: | 1 |
End Page Number: | 14 |
Publication Date: | May 2000 |
Journal: | Annals of Operations Research |
Authors: | Altiok Tayfur |
Keywords: | transportation: water, queues: applications |
The study is motivated by the operations at the bulk material handling port of Kamsar in Guinea. Bauxite ore is brought to port to load vessels that arrive on a semi-scheduled basis. Vessels go through several stages of delays due to sailing, tide and due to time in a waiting berth before and after they are loaded. We propose bounds and an approximation for a modified port time which is a significant measure of performance in bulk-material port operations.