Generating beta random rate variables from probabilistic estimates of fireline production times

Generating beta random rate variables from probabilistic estimates of fireline production times

0.00 Avg rating0 Votes
Article ID: iaor20011864
Country: Netherlands
Volume: 95
Issue: 1
Start Page Number: 205
End Page Number: 215
Publication Date: Jul 2000
Journal: Annals of Operations Research
Authors: ,
Keywords: geography & environment
Abstract:

An extension of probabilistic PERT/CPM is proposed as a framework for soliciting expert opinion to characterize random variables for stochastic treatment in simulation models. By eliciting minimum, modal, ninetieth percentile, and maximum estimates, the distribution of variables with probability density functions of beta form can be explicitly characterized without relying on the traditional, but empirically unverified, assumption of a standard deviation equal to one-sixth of the range. This practical and inexpensive technique is illustrated by application to a wildfire protection planning problem – estimating the time required to produce a given length of fireline by different firefighting resources under diverse conditions. The estimated production times are an essential input to a planning model of initial attack on wildland fires used by the California Department of Forestry and Fire Protection, and provide that agency with useful ‘rules-of-thumb’ for use in firefighter training.

Reviews

Required fields are marked *. Your email address will not be published.