Sequencing of jobs in some production systems

Sequencing of jobs in some production systems

0.00 Avg rating0 Votes
Article ID: iaor20011778
Country: Netherlands
Volume: 125
Issue: 3
Start Page Number: 535
End Page Number: 550
Publication Date: Sep 2000
Journal: European Journal of Operational Research
Authors: ,
Keywords: heuristics, construction & architecture
Abstract:

We consider a real-life problem of scheduling clients' orders in the production of concrete blocks in a building industry factory. This problem can be modelled as a hybrid flow shop scheduling problem with mixed no-wait/no-store constraints and mixed bottleneck/non-bottleneck machines. The objective function is to minimize maximum completion time. To solve the problem, we propose an approximation algorithm based on the tabu search approach.

Reviews

Required fields are marked *. Your email address will not be published.