Article ID: | iaor20011327 |
Country: | Netherlands |
Volume: | 23 |
Issue: | 3/5 |
Start Page Number: | 135 |
End Page Number: | 142 |
Publication Date: | Oct 1998 |
Journal: | Operations Research Letters |
Authors: | Sen Anup K., Benli O.S. |
We study lot streaming in shops in which the order the jobs are to be processed is immaterial. For a single job case, the properties of the optimal routing are determined. For the multi job case, two machine shops are analyzed. It is shown that lot streaming will improve makespan only if there is a job with large processing times. We show that there can be at most one such job and derive the optimal sublot sizes and their sequence.