Single machine scheduling problems with general breakdowns, earliness and tardiness costs

Single machine scheduling problems with general breakdowns, earliness and tardiness costs

0.00 Avg rating0 Votes
Article ID: iaor20003459
Country: United States
Volume: 45
Issue: 1
Start Page Number: 66
End Page Number: 71
Publication Date: Jan 1997
Journal: Operations Research
Authors: ,
Abstract:

In this paper we consider single machine scheduling problems with a common due-date for all jobs, arbitrary monotone earliness and tardiness costs and arbitrary breakdown and repair processes. We show that the problem is equivalent to a deterministic one without breakdowns and repairs and with an equivalent cost function of a Sob's completion time. A V-shaped schedule without idle times is shown to be optimal, if this equivalent cost function is quasi-convex. Conversely, we show that a V-shaped schedule may fail to be optimal if the property does not apply. We derive general conditions for the earliness and tardiness cost structure and repair and breakdown processes under which the equivalent cost function is quasi-convex. When a V-shaped schedule is optimal, an efficient (though pseudo-polynomial) algorithm can be used to compute an optimal schedule.

Reviews

Required fields are marked *. Your email address will not be published.