Mean flow time minimization in reentrant job shops with a hub

Mean flow time minimization in reentrant job shops with a hub

0.00 Avg rating0 Votes
Article ID: iaor20003454
Country: United States
Volume: 44
Issue: 5
Start Page Number: 764
End Page Number: 776
Publication Date: Sep 1996
Journal: Operations Research
Authors: , ,
Keywords: job shop, hub location
Abstract:

This paper considers a reentrant job shop with one hub machine which a job enters K times. Between any two consecutive entries into the hub, the job is processed on other machines. The objective is to minimize the total Bow time. Under two key assumptions, the bottleneck assumption and the hereditary order (HO) assumption on the processing times of the entries, it is proved that there is an optimal schedule with the shortest processing time (SPT) job order and a dynamic programming algorithm is derived to find such a schedule. An approximation algorithm based on the shortest path algorithm and the SPT job order is also proposed to solve the problem. The approximation algorithm finds an optimal clustered schedule. In clustered schedules, jobs are scheduled in disjoint clusters; they resemble hatch processing and seem to be of practical importance. Worst-case bounds for clustered schedules are proved with the HO assumption relaxed. Two special cases with the restriction that there are only two entries to the hub machine are further analyzed to offer more insight into the structure of optimal solutions.

Reviews

Required fields are marked *. Your email address will not be published.