Sequencing method for products in consideration of assembly time

Sequencing method for products in consideration of assembly time

0.00 Avg rating0 Votes
Article ID: iaor20003442
Country: Netherlands
Volume: 60/61
Start Page Number: 565
End Page Number: 573
Publication Date: Jan 1999
Journal: International Journal of Production Economics
Authors: , , ,
Abstract:

In mixed-model assembly scheduling with a single workstation, there is a new sequencing method [time-based goal chasing method (TBGC)] in consideration of the different assembly times between jobs. In this paper, we propose a new objective function in expanding the TBGC. Furthermore, we propose some heuristic methods to minimize the objective function. And through numerical experiments, we show the effectiveness of our proposal.

Reviews

Required fields are marked *. Your email address will not be published.