Article ID: | iaor20003442 |
Country: | Netherlands |
Volume: | 60/61 |
Start Page Number: | 565 |
End Page Number: | 573 |
Publication Date: | Jan 1999 |
Journal: | International Journal of Production Economics |
Authors: | Miyazaki Shigeji, Kurashige Kenji, Yoshinari Yanagawa, Kameyama Yoshimasa |
In mixed-model assembly scheduling with a single workstation, there is a new sequencing method [time-based goal chasing method (TBGC)] in consideration of the different assembly times between jobs. In this paper, we propose a new objective function in expanding the TBGC. Furthermore, we propose some heuristic methods to minimize the objective function. And through numerical experiments, we show the effectiveness of our proposal.