| Article ID: | iaor20003374 |
| Country: | Netherlands |
| Volume: | 62 |
| Issue: | 3 |
| Start Page Number: | 281 |
| End Page Number: | 285 |
| Publication Date: | Jan 1999 |
| Journal: | International Journal of Production Economics |
| Authors: | Erol Serpil, Gencer Cevriye, Erol Yalcin |
In this note, a new solution procedure similar to critical path analysis in network theory is developed for determining dynamic uncapacitated lot sizing in multi-stage production systems. The algorithm offered is a Decision Network Algorithm. An example is given to illustrate the algorithm.