Article ID: | iaor20003374 |
Country: | Netherlands |
Volume: | 62 |
Issue: | 3 |
Start Page Number: | 281 |
End Page Number: | 285 |
Publication Date: | Jan 1999 |
Journal: | International Journal of Production Economics |
Authors: | Erol Serpil, Gencer Cevriye, Erol Yalcin |
In this note, a new solution procedure similar to critical path analysis in network theory is developed for determining dynamic uncapacitated lot sizing in multi-stage production systems. The algorithm offered is a Decision Network Algorithm. An example is given to illustrate the algorithm.