Lot-bucket materials requirement planning

Lot-bucket materials requirement planning

0.00 Avg rating0 Votes
Article ID: iaor20001471
Country: Netherlands
Volume: 58
Issue: 2
Start Page Number: 173
End Page Number: 181
Publication Date: Jan 1999
Journal: International Journal of Production Economics
Authors:
Abstract:

In a variant of MRP, production is planned for lots of fixed size rather than time buckets of fixed duration. It is shown that the two methods are equivalent, and that planning of fixed-size lots has some advantages. However, introduction of a lot-bucket MRP system will meet with practical obstacles.