Calculating holding costs for single-level discrete-demand lot sizing

Calculating holding costs for single-level discrete-demand lot sizing

0.00 Avg rating0 Votes
Article ID: iaor199049
Country: United States
Volume: 27
Start Page Number: 20
End Page Number: 29
Publication Date: Mar 1986
Journal: Production and Inventory Management Journal
Authors:
Abstract:

The three methods generally used for calculating holding costs in the single-level discrete-demand lot sizing environment are considered. Two of these, the end-of-period and generated-part-period methods, are shown to be equivalent, and the third, the average-inventory-level method, develops different results.