Is it time for a physical exam of your materials requirement planning system?

Is it time for a physical exam of your materials requirement planning system?

0.00 Avg rating0 Votes
Article ID: iaor199042
Country: United States
Volume: 27
Start Page Number: 24
End Page Number: 29
Publication Date: Mar 1986
Journal: Production and Inventory Management Journal
Authors:
Keywords: production: MRP
Abstract:

Manufacturing companies spend significant time and money implementing MRP systems, often without achieving anticipated results. It is apparent that they have not defined the problem with their current manufacturing a system or the method it takes to obtain effective material and manufacturing control. A physical exam of their manufacturing system is in order.

Reviews

Required fields are marked *. Your email address will not be published.