A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations

A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations

0.00 Avg rating0 Votes
Article ID: iaor2000785
Country: Netherlands
Volume: 111
Issue: 1
Start Page Number: 152
End Page Number: 174
Publication Date: Nov 1998
Journal: European Journal of Operational Research
Authors: ,
Keywords: programming: branch and bound
Abstract:

We present an optimal solution procedure for the resource-constrained project scheduling problem (RCPSP) with generalized precedence relations (RCPSP-GPR) with the objective of minimizing the project makespan. The RCPSP-GPR extends the RCPSP to arbitrary minimal and maximal time lags between the starting and completion times of activities. The proposed procedure is suited for solving a general class of project scheduling problems and allows for arbitrary precedence constraints, activity ready times and deadlines, multiple renewable resource constraints with time-varying resource requirements and availabilities, several types of permissible and mandatory activity overlaps and multiple projects. It can be extended to other regular and non-regular measures of performance. Essentially, the procedure is a depth-first branch-and-bound algorithm in which the nodes in the search tree represent the original project network extended with extra precedence relations to resolve a number of resource conflicts. These conflicts are resolved using the concept of minimal delaying modes, which is an extension of the notion of minimal delaying alternatives for the RCPSP. Several bounds and dominance rules are used to fathom large portions of the search tree. Extensive computational experience is reported.