Managing production with flexible capacity deployment for serial multi-stage manufacturing systems

Managing production with flexible capacity deployment for serial multi-stage manufacturing systems

0.00 Avg rating0 Votes
Article ID: iaor19992981
Country: Netherlands
Volume: 109
Issue: 3
Start Page Number: 587
End Page Number: 598
Publication Date: Sep 1998
Journal: European Journal of Operational Research
Authors:
Keywords: inventory: order policies
Abstract:

This paper presents a model for serial multi-stage manufacturing systems facing variability from two sources. One source is demand uncertainty; the other is manufacturing uncertainty associated with all manufacturing stages. A production control policy based on the planned lead time and the manufacturing capacity requirement is developed. It is shown that this production control policy has the effect of reducing the variance of production output for all manufacturing stages. Some specific analyses are provided to illustrate the production control policy developed. The model developed provides a vehicle for examining the interrelationships among the production output, the planned lead time and the actual manufacturing flow time. The risk-pooling value over both demand randomness and manufacturing uncertainty, which is achieved through consolidating some manufacturing capacity and deploying flexible capacity among the manufacturing stages, is analyzed. This risk-pooling value can be realized in the form of either reduced manufacturing flow time or increased effective capacity to meet more demand. It is shown that the risk-pooling value increases as the planned lead time decreases.

Reviews

Required fields are marked *. Your email address will not be published.