Optimal streaming of a single job in a two-stage flow shop

Optimal streaming of a single job in a two-stage flow shop

0.00 Avg rating0 Votes
Article ID: iaor19992909
Country: Netherlands
Volume: 110
Issue: 1
Start Page Number: 42
End Page Number: 62
Publication Date: Oct 1998
Journal: European Journal of Operational Research
Authors: , ,
Keywords: production
Abstract:

Lot streaming is moving some portion of a process batch ahead to begin a downstream operation. The problem to be considered in this paper is the following: a single job consisting of U units is to be processed on two machines in the given order. Given a fixed number of possible transfer batches between the two machines, the problem is to find the timing and the size of the transfer batches (or, sublots) so as to optimize a given criterion. The schedules can be evaluated based on job completion, sublot completion, or item completion times. In the single job lot streaming problem, minimizing job completion time corresponds to minimizing the makespan, for which formulas for optimal sublot sizes are available. In this paper, the results for the sublot and item completion time models are presented.

Reviews

Required fields are marked *. Your email address will not be published.