HOP: A software tool for production scheduling at Bridgestone/Firestone Off-The-Road

HOP: A software tool for production scheduling at Bridgestone/Firestone Off-The-Road

0.00 Avg rating0 Votes
Article ID: iaor19992828
Country: Netherlands
Volume: 110
Issue: 2
Start Page Number: 188
End Page Number: 198
Publication Date: Oct 1998
Journal: European Journal of Operational Research
Authors: ,
Keywords: scheduling, planning, programming: integer
Abstract:

We describe the development of the Heater Optimization Program (HOP), a software tool for scheduling the curing operation at Bridgestone/Firestone Off-The-Road (BFOR). The company produces large tires for heavy off-the-road machines such as trucks, tractors and earthmoving equipment used in the construction, lumber and mining industries. The huge tires, having different priorities, are built in molds and put into heaters for the curing process. The problem is to find a feasible assignment of tires to molds and molds to heaters to achieve a maximum total priority. HOP produces about 7% more tires per shift compared to the previous manual way of developing schedules and moves the company towards its goal of quick response manufacturing with low inventories. A user-friendly Windows interface, written around our custom made optimization routines, allows for easy retrieval of the data from the company's data bases and provides for a graphical representation of the optimization results.

Reviews

Required fields are marked *. Your email address will not be published.