Article ID: | iaor1999750 |
Country: | United States |
Volume: | 95 |
Issue: | 1 |
Start Page Number: | 149 |
End Page Number: | 175 |
Publication Date: | Jan 1997 |
Journal: | Journal of Optimization Theory and Applications |
Authors: | Gong L., Matsuo H. |
Keywords: | control processes, programming: dynamic |
We develop a production policy that controls work-in-process (WIP) levels and satisfies demand in a multistage manufacturing system with significant uncertainty in yield, rework, and demand. The problem addressed in this paper is more general than those in the literature in three aspects: (i) multiple products are processed at multiple workstations, and the capacity of each workstation is limited and shared by multiple operations; (ii) the behavior of a production policy is investigated over an infinite-time horizon, and thus the system stability can be evaluated; (iii) the representation of yield and rework uncertainty is generalized. Generalizing both the system structure and the nature of uncertainty requires a new mathematical development in the theory of infinite-horizon stochastic dynamic programming. The theoretical contributions of this paper are the existence proofs of the optimal stationary control for a stochastic dynamic programming problem and the finite covariances of WIP and production levels under the general expression of uncertainty. We develop a simple and explicit sufficient condition that guarantees the existence of both the optimal stationary control and the system stability. We describe how a production policy can be constructed for the manufacturing system based on the propositions derived.