| Article ID: | iaor1999599 |
| Country: | Netherlands |
| Volume: | 94 |
| Issue: | 3 |
| Start Page Number: | 561 |
| End Page Number: | 581 |
| Publication Date: | Nov 1996 |
| Journal: | European Journal of Operational Research |
| Authors: | Stadtler Hartmut |
| Keywords: | programming: integer |
Recently there have been two new proposals to model the dynamic multi-item multi-level capacitated lotsizing problem by variable redefinitions based on either a shortest route or a simple plant location representation of the underlying decision problem. Here we will introduce an extended version of the well-known inventory and lotsize model followed by a new model formulation based on modeling the changes of end-of-period inventory levels explicitly. Secondly, we will compare the suitability of different model formulations when solving problem instances with up to 40 items and 16 periods utilizing state-of-the-art standard MIP software on a personal computer.